Sign In

Strathmore


EPCOR constructed a new biological wastewater treatment facility and has a 20-year guaranteed-performance operating contract for the water, wastewater, storm sewers and irrigation systems.


Water Facts

Strathmore currently receives its drinking water from Calgary via a transmission main line installed in 2010.


Wastewater Facts
  • EPCOR built a state-of-the-art tertiary level plant for the Town of Strathmore in 2010 and it will be commissioned in 2011. It uses Biological Nutrient Removal (BNR).
  • A portion of the treated wastewater effluent is diverted to spray irrigation of farm land.
  • The wastewater collection system consists of five wastewater lift stations.
  • The storm water system includes two lift stations and eight outfalls that discharge to a series of 12 storm water retention ponds. The storm water then flows via a watercourse to Eagle Lake, located approximately 4 km southeast of Strathmore.

 Performance Highlight Reports

Contact Information

Steven Priestley, Strathmore Site Manager
100 Slater Way
Strathmore, AB T1P 1V1
(403) 934-9440 (24 hours)


Related Information



Third Party Disclaimer:
EPCOR's website may provide listing of and/or links to third party websites as a convenient information service only. EPCOR accepts no responsibility or liability for the privacy practices, content, opinions, accuracy, and administration of such other websites, nor do we monitor or endorse these websites.