EPCOR is proposing to relocate some existing utilities in downtown Edmonton as part of the North Light Rail Transit (LRT) to N.A.I.T. Expansion, starting this summer.

 
MacEwan Station Utility Relocation


Source: Photo courtesy of the City of Edmonton, artist rendering of the future LRT line at MacEwan station.


The City of Edmonton is building a 3.3 km LRT extension northwest-bound from Churchill Station in downtown Edmonton to the N.A.I.T. campus. Included in this extension is the MacEwan LRT Station, which will be located west of 103 Street and 105 Avenue. The construction and installation of the MacEwan LRT Station would require EPCOR to relocate three underground transmission lines deeper in order to maintain acceptable clearances from the LRT Facilities.

For more details:


Kingsway Station Utility Relocation



The City of Edmonton is building a 3.3 km LRT extension northwest-bound from the downtown Churchill Station to the N.A.I.T. campus. Included in this expansion is the Kingsway LRT Station, which will be located south of the Royal Alexandra Hospital between 104 Street and 105 Street along Kingsway Avenue.


The construction and installation of the Kingsway LRT Station requires EPCOR to relocate power distribution and underground transmission lines in order to maintain acceptable clearance from the LRT facilities. This work involves excavation, trenching, and power pole removal between 108 Avenue and 112 Avenue and 103 Street and 106 Street.


For more details:


Contact

Michelle at 780-412-3234




Third Party Disclaimer:
EPCOR's website may provide listing of and/or links to third party websites as a convenient information service only. EPCOR accepts no responsibility or liability for the privacy practices, content, opinions, accuracy, and administration of such other websites, nor do we monitor or endorse these websites.